Our new address is 5555 State Street, Saginaw, MI 48603
Our phone numbers, fax numbers & email contacts all remain the same.
Effective February 10, 2020, our Bridgeport office has relocated to a new facility.
Celebrating 64 years in the Saginaw area with 17 years in at our Bridgeport office: 1956-2020
After 17 Years in our Bridgeport location we have relocated to a new office location in Saginaw. We look forward to better serving your needs providing great products, knowledge, support and solutions to NE Michigan.
Join R.L. Deppmann at our Saginaw Seminars in March, April & May 2020.
Categories
- Expansion and Noise Control
- Test and Balance
- Codes and Standards
- Vibration and Expansion Control
- Pressure Gauges and Thermometers
- Strainers
- Troubleshooting
- Valves
- Flow Measurement
- Flow Meters
- Electrical
- Plumbing System Design
- Hydronic Design
- Steam
- Tanks
- Variable Frequency Drives
- Water Heaters
- Pumps
- Constant Speed
- Identification
- Parallel Pumping
- Troubleshooting
- Affinity Laws
- Chilled Water
- Balancing
- Speed
- NPSH
- Primary Secondary
- Cooling Towers
- ECM
- Piping and Installation
- Pressure Boosters
- Selection and Specification
- Condensate
- Variable Speed
- Operation
- Domestic Water Recirculation
- Sump and Sewage
- Selection and Specification
- Glycol
- Minimum Flow
- Commissioning and Balance
- Motors
- Monday Morning Minutes
- Service Tip of the Month
- Announcements
- Boilers
- Controls
- Heat Exchangers
- Humidifiers
- Glycol and Water Quality
- Air and Dirt Control
- Cooling Towers
- Press
- Hydronic System Design
- Control Valves
- Cold Water Makeup
- Vibration
- Expansion and Noise Control
- Parallel Pumping
- Expansion/Compression Tanks
- Heating
- Primary Variable Piping
- Test and Balance
- Commissioning and Balance
- Affinity Laws
- Chilled Water
- Pipe Sizing
- Air Separators
- Design Tools
- Cooling
- Chemical Feed
- Primary Secondary Piping
- Commissioning and Balance